Book a call

Log in

Book a call

Harry +44 7488 893313

All guides

Buyer's guides · Who to buy through

Should we buy commercial solar through an installer, a broker or a consultant?

Installer, broker, consultant or procurement partner: who works for you, and who pays whom.

Written by Harry HainesCEO & Co-Founder, CH Group Updated · 8 min read

CH Group runs controlled solar tenders for commercial sites of 100 kWp and above.

Two site professionals seen from behind at a meeting table in a UK industrial building, with hard hats, a rolled roof plan and a tablet

The short answer

Going direct to an installer is the quickest route for a simple roof, but it gives you one proposal from the seller. An independent consultant or a procurement partner adds comparison, and each is paid in a different way. Ask every adviser who pays them and how much before you rely on their recommendation.

Energy brokers mostly arrange energy supply contracts. Ofgem says they are typically paid through a fee or commission added to the energy bill 1, and those rules are written for energy supply contracts. We found nothing showing they cover solar procurement. CH Group is paid a fee agreed in writing, and its installer partners also pay CH Group.

Figures checked

Key numbers

Key numbers
FigureSource
Ofgem call for input on the broker (TPI) market4 June 2026 (closed 16 July 2026)Ofgem 1
Date suppliers must show bill-paid broker fees per unit to all non-domestic customers1 October 2024Ofgem 2
Ofgem power to make brokers repay commission (2022 guidance)None (voluntary principles only)Ofgem 3
Government plan to regulate brokersFactsheet published 4 November 2026, no start dateGOV.UK 4

What goes wrong, and what does it cost?

The usual mistake when choosing a route to buy commercial solar is assuming the adviser is unpaid or neutral, so the board approves a quote that was never tested against anything.

The board is asked to approve a quote, and nobody can say whether it is a good one. That is the real risk in every route, and it looks different in each.

  • Assuming advice that costs you nothing is unpaid. Ofgem notes that an energy broker is typically paid via the energy supplier rather than directly by the customer 1. Whoever pays an adviser can shape what the adviser recommends.
  • Assuming energy-broker protections apply. Ofgem's broker rules cover energy supply contracts. We found no Ofgem or GOV.UK rule that covers advisers who arrange solar installations, so check before you assume protection.
  • Treating a voluntary code as vetting. Ofgem lists the broker codes of practice as voluntary 1. Membership on its own does not show that anyone has checked the adviser's work.
  • Taking one proposal at face value. A single installer sets its own scope and yield assumptions, and you have nothing to benchmark them against.
  • Waiting for regulation. The government plans to regulate brokers, but its factsheet of 4 November 2026 gives no commencement date 4.

The cost of each mistake is a project priced or scoped on assumptions you could not see. Our guide to comparing commercial solar quotes shows what to check in any proposal, whichever route produced it.

Who pays whom in each route?

Each route is paid differently: an installer earns a margin in the system price, a broker is typically paid by commission or fee, a consultant by a fee or a referral, and CH Group by a fee agreed in writing plus payments from its installer partners.

Going direct to an installer

You pay the installer. Its margin is inside the system price, and we found no public figure for typical margin. You get one point of accountability and, from installers that employ their own engineers, in-house design. One installer's own guide says it refuses broker commissions 5, which is that installer's own stated policy, not an industry rule.

An energy broker

Ofgem says brokers are typically paid through a service fee or commission added to the energy bill, and that this can misalign incentives 1. Since 1 October 2024, where a broker's fee is paid through the energy bill, suppliers must show it as a cost per unit to all non-domestic customers 2. That rule is written for energy supply contracts, and we found nothing showing it covers solar installations.

An independent consultant

We found no sourced figure for consultant fees. A consultant may charge you a fee or receive a referral payment from the installer. We found no source on which is more common, so ask which, and ask for the amount. A lead-generation site that does not install states that the installer pays it when a survey is arranged 6. That is an installer-paid referral model.

A procurement partner such as CH Group

CH Group's fee is agreed in writing before the client commits to anything. Its installer partners also pay CH Group. Every partner bids against the same brief, so no installer can buy a better place in the comparison. You should still ask any adviser, CH Group included, for the full terms in writing.

How do the four routes compare, and which suits whom?

Going direct, using a broker, hiring a consultant and using a procurement partner each suit a different buyer, and none is best for everyone.

The table shows how each route is paid, where the risk sits and which buyer it fits.

Four routes to buy commercial solar
RouteHow the adviser is paidGood atWatch forBest for
Direct to an installerMargin inside the system priceSpeed, one point of accountability, in-house engineers at some firmsOne proposal, with scope and yield assumptions set by the sellerA simple roof, or a buyer who already holds comparable quotes and trusts the installer
Energy brokerCommission or fee added to the energy bill, or paid directly by the customer (Ofgem)Switching energy supply contractsMisaligned incentives; some have not clearly disclosed commission (Ofgem); usually not a solar installation specialist (our reading)Buying electricity or gas supply, not choosing a solar installer
Independent consultantNot sourced: a client fee or an installer referral, so askIndependent technical review of a design or quoteQuality varies; voluntary codes are not vettingA buyer with a specific technical question or an unusual roof, who wants a named expert
Procurement partner (CH Group)Fee agreed in writing; installer partners also pay CH GroupOne controlled tender to a vetted panel, a verified half-hourly baseline, every proposal on the same ten variablesInstaller partners pay CH Group, so ask for the full terms; a tender takes longer than going directA 100 kWp or larger site with no trusted installer yet, or quotes that cannot be compared

Our guide to commercial solar cost in the UK gives the public price ranges to test any proposal against.

Do the energy-broker rules protect a solar buyer?

The Ofgem rules on energy brokers, known as third-party intermediaries (TPIs), cover energy supply contracts and we found nothing showing they apply to advisers who arrange solar installations.

That is our reading of the sources, so confirm it with Ofgem before you rely on it. Three facts matter.

  • Ofgem's 2022 guidance says it does not license brokers and has no legal power to require them to repay commission, and it set voluntary principles instead 3.
  • Suppliers may only work with brokers that belong to a redress scheme for micro business contracts 2. A buyer with a 100 kWp roof is usually not a microbusiness. Ofgem's 2022 guidance defines one as fewer than 10 employees with turnover or balance sheet up to £2m, or annual use of no more than 100,000 kWh of electricity or 293,000 kWh of gas 3.
  • The government has said it will make Ofgem the regulator, with an authorisation process and powers to order redress, fine and ban. The factsheet gives no start date 4.

When is CH Group not the right route?

CH Group is not the right route for a small or simple system, for a buyer who already holds comparable quotes and trusts an installer.

  • Small or simple systems. A controlled tender earns its place on larger sites. For a small or simple system, going direct to a reputable installer is usually proportionate.
  • Quotes already in hand. If you hold comparable proposals and trust one installer, a tender adds time. We can put existing quotes on a single basis if you want a check, but you do not need to run a tender.
  • A named expert. If you want one individual's technical opinion on a difficult roof, a consultant may fit better.

Our guides to timelines and grid connection and funding options apply whichever route you choose.

CH Group project: projected figures

Kelston Sparks: three comparable proposals for a 116 kWp roof

Earlier solar enquiries had left Kelston Sparks, a plant and machinery hire business in Bristol, without a common basis for comparison. A structured tender gave it three suitable contractors, one consistent brief and three comparable proposals.

All three contractors visited the site before the business chose its installer. The contract was awarded 22 days after the site survey. The 116 kWp system has a projected annual saving of £20,075 and a projected payback of 2 years 10 months. Projections depend on the site's energy use, tariff and system, and are estimates, not promises. See the projects page for the full case.

Your next steps

  1. Decide what you need to compare List your system size, whether your roof is simple, and whether you already hold quotes. That tells you whether going direct is enough.

  2. Ask every adviser who pays them Ask who pays them, how much, and what they receive if you choose the installer they recommend. Get it in writing before you commit to anything.

  3. Put proposals on one basis Use the same brief and the same variables for every quote, whichever route produced them.

  4. Check tax treatment separately Ask your accountant about capital allowances and funding before the board signs.

How CH Group handles this

Choosing who to trust is the hard part, so we show our workings. Every tender starts from twelve months of half-hourly data, checked before anyone quotes. We run one controlled tender to our panel of vetted installer partners, and compare every proposal on the same ten variables: system size, generation, self-consumption, £/kWp, equipment, warranties, savings, payback, programme and commercial terms.

Our fee is agreed in writing before you commit to anything, and installer partners also pay CH Group. Every partner bids against the same brief, so no installer can buy a better place in your comparison. You then receive one recommendation, with the numbers in your portal. Savings are projected, and we do not give regulated financial or tax advice. If the tender says you should not proceed, that is the recommendation.

Questions buyers ask next

Should I use an energy broker for commercial solar?

An energy broker mainly arranges gas and electricity supply contracts. We found no rule that covers brokers arranging solar installations, so ask any broker how they are paid and what experience they have of rooftop solar tenders.

How much do energy brokers charge?

We found no sourced figure for solar procurement. For energy supply, Ofgem says brokers are typically paid through a service fee or commission added to the energy bill, and where that fee is paid through the bill, suppliers must show it per unit.

How do I know if an adviser is independent?

Ask who pays them and what they receive from the installer you choose. Membership of a trade body such as the Energy Consultants Association, which says its members follow a code of practice, is not on its own proof of independence.

What happens after I sign with an installer?

The installer surveys, designs, installs and commissions the system, and you hold the warranties and a contract with that installer. A procurement partner should hand over once the contract is signed, so ask who you call if something goes wrong after commissioning.

Is a commercial solar consultant worth the fee?

It can be, for a technical question or an unusual roof where you want a named expert. We found no sourced fee levels, so ask for the fee in writing and whether the consultant also receives anything from installers.

Sources

Public figures are from the sources below, as published on the dates shown. CH Group project figures are projections supplied for each case study. This guide is general information, not financial, tax or legal advice.

  1. Ofgem, Third-Party Intermediaries market review: Call for Input, 4 June 2026.
  2. Ofgem, Non-Domestic Market Review Decision, 5 April 2024.
  3. Ofgem, Third party intermediaries: what your microbusiness needs to know, 14 October 2022.
  4. GOV.UK, Regulation of third-party intermediaries (Energy Independence Bill factsheets), 4 November 2026.
  5. Solar4Good UK Ltd, Commercial Solar Buyer's Guide 2026 (installer publication), June 2026.
  6. Business Solar Check, Home page (lead-generation site), 2026.
  7. Energy Consultants Association, Home page (trade body, self-description), 9 October 2026.

Let's look at your site.

A short call with Harry or James. We get to know your site, energy use and objectives, and show you how a structured tender would work for you.

  1. Initial review We get to know your site, energy use and objectives.

  2. Energy assessment We analyse your energy data and solar potential.

  3. Structured tender Our vetted EPC partners compete for your project, and we give you a clear recommendation.

Book a call

Opens Calendly in a new tab.

Prefer to talk now? Call Harry on +44 7488 893313.